Skip to content
Tonyajoy.com
Tonyajoy.com

Transforming lives together

  • Home
  • Helpful Tips
  • Popular articles
  • Blog
  • Advice
  • Q&A
  • Contact Us
Tonyajoy.com

Transforming lives together

21/08/2022

What time is the last train in Bangkok?

Table of Contents

Toggle
  • What time is the last train in Bangkok?
  • What time does MRT open and close?
  • What is the operating hours of MRT?
  • Is SRT red line open?

What time is the last train in Bangkok?

Suvarnabhumi Airport Rail Link Timetable The Airport Rail link operates 7 days a week, 365 days a year. On weekdays the first train is at 05:00 and the last at 00:00 (midnight). At weekends and public holidays trains operate between 05:29 and 00:08. Trains run at 10 to 15 minutes intervals.

How long does the airport rail link take?

approximately 26 minutes
Journey time is approximately 26 minutes. This makes taking the train the quickest and most convenient way to travel in and out of Bangkok. The trains operate between 05:30 – midnight daily.

What time does MRT open and close?

MRT 3 Schedule / Operating Hours MRT 3 operates from Monday to Sunday during the GCQ. The first trip from both North Avenue is at 4:40 AM and 5:26 AM from Taft Avenue. The last trip from the north is at 9:30 PM, while the last trip from Taft is at 10:16 PM.

How much is a taxi from Bangkok Airport to the city Centre?

How much is a taxi from Bangkok airport to the city centre? The average taxi fare from Bangkok International Airport (BBK) to the city centre is calculated using a taximeter and should be around €6.80 (240 THB). There is an airport surcharge of €1.40 (50 THB).

What is the operating hours of MRT?

MRT3 train Schedule

Day Operating Hours Frequency
Sunday 12:00 AM – 11:00 PM 1 min
Monday 4:59 AM – 9:10 PM 7 min
Tuesday 4:59 AM – 9:10 PM 7 min
Wednesday 4:59 AM – 9:10 PM 7 min

What time is the first trip of MRT?

Is SRT red line open?

The line finally opened for trial operations on 2 August 2021. Full commercial services began on 29 November 2021….SRT Dark Red Line.

SRT Dark Red Line สายสีแดงเข้ม
Technical
Line length 86.8 km (53.94 mi) (Total planned)
Track length 26 km (16.16 mi) (Phase 1)
Track gauge 1,000 mm (3 ft 33⁄8 in) metre gauge
Q&A

Post navigation

Previous post
Next post

Recent Posts

  • Is Fitness First a lock in contract?
  • What are the specifications of a car?
  • Can you recover deleted text?
  • What is melt granulation technique?
  • What city is Stonewood mall?

Categories

  • Advice
  • Blog
  • Helpful Tips
©2026 Tonyajoy.com | WordPress Theme by SuperbThemes